International engineering project logistics service expert!
CN EN

Container operation process 

Large object transport operations


International Engineering Project Logistics Operation Process

The implementation of all types of complex projects throughout the logistics program development and on-site physical operation services, the scope of work from the starting point of loading and unloading truck delivery to the destination site delivery, including the entire logistics management and planning projects, line exploration, land transport, river transport, Shipping, air transport, customs clearance, oversized hoisting bundled reinforcement, barge transhipment, dock docking, handling operations, packaging and storage support, the specific process is as follows:

1)Customer needs analysis:The customer needs to understand the nature of the goods transported, master the physical properties such as size, weight, structure and material properties and other characteristics, combined with customer requirements for transport time and tools for the transport program design ready.

2)Project team established:According to customer needs and transport requirements, the selection of experienced sea, land transport, packaging and reinforcement, customs clearance and other professionals in all aspects of the project team.

3) Line site survey:Study various transportation restrictions such as road width, tunnel height, river depth, bridge strength and other factors, analyze the traffic conditions of the entire transport line and weather factors to ensure the safety and smooth transport process.

4)Project implementation plan development:

①According to the properties of the goods, the information of the country of departure and destination countries, the conditions of the ports and the road conditions should be examined at the same time, and the transportation routes and means of transportation with the best cost under the premise of ensuring the safety and efficiency of transportation should be selected.

②Hoisting, banding, reinforcement, loading and unloading program design, especially for the major pieces of the development of the corresponding program;

③Preparation of various ships, vehicles and other special tools, especially for the preparation of heavy goods transport equipment;

④Prepared to ensure the declaration of customs clearance information project continued effective implementation;

⑤The legal problems that may be encountered during the operation of the project ensure the continuous and effective implementation of the project;

⑥Docking docks and shipping companies to ensure the continued effective implementation of the project;

⑦Standardize the operating plan formulation, especially for the operation of major pieces of norms to ensure safety;

⑧Prepare contingency plans and exercises to deal with emergencies to ensure safety.

5Project implementation and control:Real-time follow-up and process quality and safety control ensure safety and timeliness, communicate with customers from time to time and control extra costs.

6) Project Completion Summary:After the completion of the project, we will interview customers, listen to feedback from customers, summarize the problems occurred in the project implementation process, analyze the reasons and make suggestions for improvement, and constantly improve the operation capability and service level of the project.



深圳市新大陆国际物流有限公司    版权所有    粤ICP备10044205号

Phone:0755-26391402    Fax:0755-26391302    E-mail:sales1@xdl56.com/bd2@xdl56.com/darren@xdl56.com zyl@xindalu56.com

Address:30CD, Sea Scope Plaza No. 18 Tai Zi Road Nanshan District Shenzhen,China

Sitemap Legal Notices Links

0755-26391302